EV Model Matchup • 85 kWh Pack

Chevrolet Equinox EV: Home Charging Cost & Level 2 Payback Analysis

With a 85 kWh battery rated around 3.5 mi/kWh, charging your Chevrolet Equinox EV at home off-peak ($0.095/kWh US avg) costs $326/year—saving $1,153/year against a 28 MPG gas competitor.

Pack & Efficiency 85 kWh 3.5 mi/kWh real-world blend
US Avg Off-Peak/Yr $326/yr ($576/yr on std $0.168/kWh)
Gas Baseline Savings +$1,153/yr vs 28 MPG @ $3.45/gal
20→80% Charge Speed 4.6 hrs (L2) vs 38 hours on 120V wall outlet

Chevrolet Equinox EV Charging Cost Across Major U.S. Markets (12,000 Miles/Yr)

State Market Std / Off-Peak Rate 0–100% Full Charge Annual Off-Peak Cost Annual Savings vs 28 MPG Gas Simulate
California $0.315 / $0.145 Off-Peak $12.32 Full Fillup $497/yr +$1,539/yr saved Run CA →
New York $0.238 / $0.125 Off-Peak $10.63 Full Fillup $429/yr +$1,050/yr saved Run NY →
Texas $0.148 / $0.075 Off-Peak $6.38 Full Fillup $257/yr +$1,007/yr saved Run TX →
Florida $0.156 / $0.088 Off-Peak $7.48 Full Fillup $302/yr +$1,091/yr saved Run FL →
Washington $0.125 / $0.068 Off-Peak $5.78 Full Fillup $233/yr +$1,546/yr saved Run WA →
Massachusetts $0.285 / $0.155 Off-Peak $13.18 Full Fillup $531/yr +$948/yr saved Run MA →

Why a 48A Level 2 Wall Charger Is Essential for the Chevrolet Equinox EV

Plugging a 85 kWh battery like the Chevrolet Equinox EV into an ordinary 120V Level 1 household outlet adds only ~1.35 kW per hour (~4.7 miles of range per hour). Recovering 60% of battery capacity (from 20% to 80%) on Level 1 requires roughly 38 hours, making multi-day cold snaps or 60+ mile commutes nearly impossible to keep up with.

Upgrading to a 48A 240V hardwired charger (11.5 kW continuous) cuts that identical 20% to 80% replenish window down to 4.6 hours—easily completing inside overnight utility Time-of-Use discount windows (using a UL-listed Emporia 48A or ChargePoint Home Flex charger).

Frequently Asked Questions

How much electricity does a Chevrolet Equinox EV use per year?

Driving 12,000 miles at 3.5 mi/kWh consumes approximately 3,429 kWh per year—roughly $326/yr on overnight TOU rates or $576/yr on standard flat tariffs.

Does the Chevrolet Equinox EV need a 50A or 60A breaker?

For maximum 48A continuous Level 2 charging speed (11.5 kW), NEC 625 requires a 60-amp dedicated breaker hardwired into the wall unit. For plug-in NEMA 14-50 cords on a 50A breaker, max continuous draw is 40A (9.6 kW).

Explore Related Data & Guides